Description
Équipe Laurence designed and supervised the installation of a 2 km steel pipeline to convey water to the summit of the ski slopes and supply the snowmaking system, as well as a 1.7 km permanent access road. Water is drawn from the Rivière du Diable and pumped to the mountain through a pumping station whose capacity was increased from 8,000 to 12,000 USgpm following our studies. The project also included the construction of two new pumping stations (4,000 USgpm each) and two electrical service entrances (1,200 A and 3,000 A). No additional environmental approvals were required, as Équipe Laurence had previously obtained the necessary authorization from the MELCC in 2001.
An Ingenious and Sustainable Solution
Challenges
Équipe Laurence was retained in February 2019, with commissioning required before the upcoming winter ski season, only a few months later. To meet this ambitious schedule, and with the client’s approval, critical equipment was pre-purchased, including pumps that required a 22-week manufacturing and delivery lead time. The project was also delivered using a phased design approach carried out concurrently with construction. As soon as a phase was designed and ready, construction began immediately while design work continued on subsequent phases.
Results
Station Mont Tremblant can now confidently extend its ski season by producing snow earlier and later in the season while optimizing winter operations without concerns related to equipment freezing.