Description
Quality-driven, top-tier work
Challenges
The main challenge was a 9% grade at the roundabout, requiring 3D modelling to anticipate infrastructure behaviour and optimize the design. The project also had to integrate multiple urban functions: cycling paths, 2-metre sidewalks, connections between two parking lots and specific lighting to maximize safety.
Stormwater management was another major challenge, as the drainage networks from the CEGEP and UQAT both discharged into the same system before reaching the river. The team had to work within the constraints of retaining an existing pipe, a City directive, while improving overall network performance. Finally, accounting for all urban mobility users — pedestrians, cyclists, motorists, and families — guided design decisions toward smoother and calmer traffic flow.
Results
The reconstruction of Rue Parent transformed the area into a true student hub and modern urban corridor. The new roundabout provides a clear, safe point of access to the future campus while improving traffic flow for all users.
The cycling and pedestrian infrastructure promotes active and accessible mobility, while the redesigned lighting enhances safety after dark. Integrating the existing pipe with the new networks enables more efficient stormwater management suited to the neighbourhood’s ongoing development. The result: a cohesive, welcoming environment designed to support the area’s growth for years to come.



