Description
The project led to the construction of an industrial campus in Mirabel, including a battery assembly plant and an innovation centre. Located on a large wooded site near Highway 50 and the airport, the property was fully developed by Équipe Laurence. Parking areas, truck access roads, loading docks, municipal service connections, stormwater management systems, and green spaces were designed and implemented efficiently with close attention to detail.
A Large-Scale and Innovative Project
Challenges
Several key challenges were identified early in the project, including schedule compliance, coordination with the City, and sustainable development considerations. The design timeline and the City of Mirabel’s review process for plans and specifications leading to the issuance of construction permits represented significant challenges, and a master plan was established at the beginning of the mandate. In addition, because the project was delivered using a design-build approach, design and construction activities occurred simultaneously, creating additional complexity, particularly on a site of this scale. Once excavation began, the teams discovered that soil quality was lower than anticipated, requiring a complete revision of the grading plan to minimize the impact of soil conditions on overall project costs.
Results
The successful completion of the mandate resulted in the delivery of all planned project components, including the construction of two open-air retention ponds equipped with flow regulators and outfalls. A landscape architect completed the final enhancement of the ponds, integrating them harmoniously into the site.