As part of the prestigious Domaine Sommet de la Marquise residential development in Saint‑Sauveur, comprising 84 residential lots, Équipe Laurence completed the full design of the project, including lot layout, road design, clearing plan development, stormwater management system design, preliminary grading, and construction supervision. Since 2013, we have completed all five planned phases of construction and are currently working on drainage improvements across the development. We recently completed the design of an additional retention basin and maintenance upgrades to the drainage trench system.
A Visionary and Responsible Project
Challenges
During the lot layout process, particular attention was paid to protecting riparian buffers and environmentally sensitive areas. The developer also requested that the natural environment, including mature trees, be preserved as much as possible. Because the project was located on a mountainous site with steep slopes and shallow bedrock, creative solutions were required to control construction costs. Significant emphasis was also placed on stormwater management to minimize runoff, as the capacity of downstream infrastructure was limited. The selected solution combined drainage trenches designed to capture frequent rainfall events with a pipe network and retention basin to manage more intense storms.
Results
This project enabled us to refine our stormwater management approaches. The drainage trench and dual-drainage system, innovative at the time, demonstrated its effectiveness and provided valuable insights into improving the long-term sustainability of this type of infrastructure. Subsequent adjustments have allowed us to incorporate these lessons learned and further enhance our practices for future projects. In addition, evolving municipal requirements throughout the various phases strengthened our adaptability and agility in design, reinforcing our commitment to delivering compliant and high-performing solutions.