Description
As part of the Les Clos Prévostois residential development in the City of Prévost, the mandate consisted of constructing a new street and included clearing, rough grading, the installation of municipal watermain, sanitary sewer and storm sewer services (drainage and stormwater management), the installation of a sediment treatment system, paving, and concrete curbs. The site topography and existing watercourses were taken into consideration in the overall development design.
A Leading-Edge Project Focused on Quality
Project Details
- Watermain: 730 linear metres
- Storm sewer: 700 linear metres
- Sanitary sewer: 620 linear metres
- Respect for riparian buffer zones in the subdivision layout
- Construction of rear-lot embankments
- Installation of a suspended solids treatment system
- Establishment of lot elevations for the construction of each home
Results
The project was carried out with particular attention to environmental protection and the harmonious integration of infrastructure within the natural environment. This project illustrates our ability to combine technical innovation with environmental responsibility while delivering sustainable and safe developments for future residents.