Description
As part of the Les Clos Prévostois residential development in the City of Prévost, our mandate included the construction of a new street and covered clearing, rough grading, the installation of municipal watermain, sanitary sewer, and storm sewer infrastructure (including drainage and stormwater management), paving, and concrete curbs. The site’s topography and existing watercourses were taken into consideration throughout the overall development design.
A Leading-Edge Project Focused on Quality
Project Details
- Watermain: 400 linear metres
- Storm sewer: 450 linear metres
- Sanitary sewer: 520 linear metres
- Protection of riparian buffers in the subdivision layout
- Construction of rear-lot embankments
- Design of a stormwater management system integrated into a pedestrian crossing
- Establishment of lot elevations for the construction of each home
Results
The project included the complete construction of the infrastructure required for this residential development, including watermain, sanitary sewer, and storm sewer networks, as well as roadway and curb construction. Particular attention was given to stormwater management and the harmonious integration of the development into the natural environment, notably through the protection of riparian buffers and the design of safe embankments. This approach helped create a sustainable residential environment well suited to the site’s natural characteristics.