The Municipality of Cantley retained Équipe Laurence to rehabilitate 5 km of Chemin Mont-des-Cascades. The project included design and construction supervision services, the replacement of 25 culverts, drainage improvements, roadway reconstruction, and paving within a complex natural environment.
A Sustainable and Exemplary Project
Challenges
The project presented several technical and environmental challenges. The geotechnical study required raising the roadway elevation in certain areas, involving precise earthwork operations to remain within the municipal right-of-way. A buried pavement layer that had not been identified during the preliminary investigation was discovered during construction, requiring a rapid redesign to prevent water accumulation. Unstable, water-saturated soils necessitated full excavation and the installation of granular materials and geotextiles. The proximity of wetlands and Lac Cascade required rigorous environmental protection measures, including sedimentation basins and sediment control barriers. Finally, coordinating the work along a narrow and winding roadway required careful management of road geometry and property access.
Results
The roadway was modernized with a durable pavement structure, efficient drainage, and improved driving comfort. Safety enhancements, including speed humps and guardrails, were also installed.